Files
backup-tool/docs/runbooks/upgrade.md

732 B

Upgrade and rollback runbook

  1. Record the running image digest and take a tested metadata backup plus repository recovery evidence before changing the image.
  2. Pull/build the pinned image, then run docker compose run --rm migrate upgrade. Do not start web, scheduler, or worker against an unverified schema.
  3. Start the stack, wait for /readyz, and inspect /metrics for stale leases, schedule lag, unavailable repositories, and corrupt backups.
  4. If migration fails, stop and restore the prior metadata backup and matching image; do not attempt to downgrade an unknown partially migrated database in place.
  5. Preserve migration logs and verify a representative backup restore before closing the change.